Demand planning · Cheat sheet + free Excel

9 forecast formulas every planner should know

An S&OP deck can show one forecast accuracy number without saying how it was calculated. Here are the nine formulas behind most forecast KPIs, what each one tells you, and where each one misleads.

Sergey MasyaginKinaxis Solution Architect, 19 years in supply chain planningNovember 2026
Cheat sheet: 9 forecast formulas. Forecast error, MAPE, WAPE, forecast accuracy, bias, tracking signal, forecast value added, coefficient of variation, simple exponential smoothing.
Forecasting in simple math. F = forecast, A = actual. Save it or share it with your team.
Want to run these on your own data? Get the free Excel calculator: paste actuals and forecasts, get all 9 metrics by item and for the portfolio. Jump to the calculator ↓

The nine formulas

01Forecast error

Error = Forecast − Actual

Pick one sign and write it on the slide. Here, positive means over-forecast. Half the arguments about "bias" in S&OP meetings come from two teams using opposite signs.

02MAPE

MAPE = average of ( |Actual − Forecast| ÷ Actual ) × 100%

Sold 1, forecast 3: 200% error. Small actuals inflate MAPE, and zero actuals make it undefined. Use it for items with steady volume, not for a long tail of slow movers.

03WAPE

WAPE = Σ |Actual − Forecast| ÷ Σ Actual × 100%

A useful portfolio metric because it weights errors by volume. The flip side: high-volume items can hide problems in smaller ones. Look at it by segment, not only in total.

04Forecast accuracy

Accuracy = 100% − WAPE

This is the definition used here. It can go below zero. Companies define "accuracy" in different ways, so check the formula before you compare numbers between teams, sites or vendors.

05Bias

Bias = Σ (Forecast − Actual) ÷ Σ Actual × 100%

Positive and negative errors cancel, so bias shows direction, not size. Persistent positive bias builds excess inventory month after month. Persistent negative bias shows up later as missed service.

06Tracking signal

Tracking signal = Σ (Forecast − Actual) ÷ MAD

MAD is the average absolute forecast error. ±4 is a common warning threshold. Crossing it calls for investigation, not an automatic model change: check for a promotion, a new customer, a master data change.

07Forecast value added

FVA = WAPE before a step − WAPE after that step

Compare the whole process with a naive baseline, and each override with what came before it. Positive means improvement, measured in percentage points. If a review step makes the forecast worse, it is costing you time and accuracy.

08Coefficient of variation

CoV = standard deviation of demand ÷ average demand

Measures variability, not forecastability. Seasonal demand can vary a lot and still be predictable. Use CoV to segment items, then decide where to invest forecasting effort and where to rely on buffers.

09Simple exponential smoothing

Next forecast = α × last actual + (1 − α) × last forecast

High α reacts faster, including to noise. Low α smooths more but reacts later. This basic model does not capture trend or seasonality, which makes it a good benchmark: if it beats your process, your process needs a look.

One rule across all of them

Compare the same items, periods and forecast lag. A 3-month-lag accuracy and a 1-month-lag accuracy are different numbers. So are accuracy on all SKUs and accuracy on the top 80% of volume.

Accuracy shows the size of the miss. Bias shows its direction. You need both on the slide.

Free Excel template

Forecast accuracy calculator

Paste item, period, actual and forecast. The workbook calculates all nine metrics by item and for the portfolio.

You will get an email with a confirmation button. One click and the download opens. You will also get one short planning note each Saturday. Unsubscribe any time.

About the author

Sergey Masyagin is a certified Kinaxis Maestro Solution Architect with 19 years in supply chain planning, ex-P&G and EY. He helps companies make their planning systems work in daily operations: implementation, audits, AMS support and AI agents for planning teams.

Book a 30-min call →